Hindi Version My Email
Search 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
You are here :: HOME : SECTORS OF OPERATION : ROPEWAYS
    

ROPEWAYS

Business Profile 

RITES offers multi-disciplinary consultancy expertise in the field of Ropeways for selection of appropriate ropeway system suited for various terrains, traffic levels, etc. RITES offer an optimal choice from the Monocable/Bicable systems conforming to Detachable, Jigback and Pulsated ropeways for transport of men and materials. In addition, it offers complete civil, structural, electrical and mechanical engineering services related with ropeways. Funicular Railway is also an area where RITES also marks its presence felt.

 Services 

  1. Technical audit of existing ropeway system.
  2. Preparation of Techno-Economic Feasibility Studies including broad Design & Engineering.
  3. Bid Process Management.
  4. Project Management on behalf of Client.
  5. Quality Assurance.
  6. Testing & Commissioning.
  7. Helping Client during operation & maintenance.

Contact Information

Mr. Anil Vij, GGM (RW&IE)
Tel  :- 91-124-2571627
email Id:- anilvij@rites.com  

 Important Projects

 Ongoing 

  1. Project Management Services of Monocable Detachable Gondola system for carrying 250 passengers per hour at Namchi, South Sikkim, India.
  2. Project Management Services for Monocable Pulsated Gondola Ropeway system for carrying 250 passengers per hour at Namchi, South Sikkim, India.
  3. Project Management Services for Bicable Jig Back (double reversible) system for carrying 800 passengers per hour at Shri Mata Vaishno Devi Shrine, Katra, J&K, India.
  4. Project Management Services for Bicable Jig Back (double reversible) system for carrying 5 tons materials per hour at Shri Mata Vaishno Devi Shrine, Katra, J&K, India.
  5. Project Management Services for Bicable Jig Back (double reversible) system for carrying 250 passengers per hour across River Brahmaputra, Guwahati, Assam, India.
  6. Project Management Services for Monocable Detachable Gondola system for carrying 500 passengers per hour at Rajgir, Bihar, India.
  7. Services as Independent Engineer for Double reversible Funicular Railway system for carrying 1200 passengers per hour at Nashik, Maharashtra, India
  8. Services as Independent Engineer for Double reversible Funicular Railway system for carrying 1000 passengers per hour at Thane, Maharashtra, India
  9. Project Management Services for revamping of Passenger Ropeways system between Joshimath and Auli in Uttaranchal

 Completed 

  1. Monocable Detachable Gondola system (2 independent sections) for carrying 1500/600 passengers per hour between Gulmarg and Apharwat via Kongdori, J&K, India.
  2. Chairlift & Skilift (2 independent ropeways) for carrying 400 passengers per hour at the Ski Resort of Auli, Uttrakhand, India.
  3. Bicable Jig Back (double reversible) system for carrying 250 passengers per hour at Gangtok, Sikkim, India.
  4. Monocable Detachable Gondola system for carrying 500 passengers per hour at Trikut hill, Deoghar, Jharkhand, India.
  5. Bicable Jig Back (single reversible) system for carrying 60 passengers per hour across river Bhilanga,Tehri Garhwal, Uttrakhand, India.
  6. Moncable Jig Back for carrying 225 passengers per hour at Makhdoom Sahib Shrine , Srinagar, J&K

Major Reports Prepared

Passanger Ropeway 

  • Techno Economic Feasibility study for Ropeway system from Palchan to Rohtang, HP, India.
  • Detailed Project for a passenger ropeway across River Brahmaputra, Guwahati, Assam, India.
  • Techno Economic Feasibility study for Ropeway system at Bijli Mahadev, Kullu, HP, India.
  • Techno Economic Feasibility study for Ropeway system at Palampur, HP, India.
  • Techno Economic Feasibility study and tendering services for a passenger ropeway between Jammu to Mahamaya Forest Enclave via Bagh-a-Bahu at Jammu. J&K. India.
  • Techno Economic Feasibility Study for a Ropeway system from foot to peak of the big hill at Sholingur, Tamilnadu, India.
  • Project report of the proposed passenger Ropeway between Dehradun and Mussoorie in Uttarakhand, India.
  • Detailed Project for a Ropeway system at Trikut Hill near Deoghar, Jharkhand,India.
  • Techno Economic Feasibility study for a passenger ropeway between Shri Anandpursahib and Nainadeviji near Anandpur sahib. Punjab, India
  • Techno Economic Feasibility study for a Funicular Railway at Matheran in 2010.
  • Detailed Project for a passenger ropeway between Bhawan and Bhairon Temple via at Katra, J&K, India.

Material Ropeway 

  • Detailed Project for a Material Ropeway for transportation of Cement from Gagal Plant at Barmana to Kiratpur Sahib Rail Head for ACC. Approximate length of Ropeway was 42 km.
  • Detailed Project for a Material Ropeway for transportation of Lignite from Mine to NLC Power Plant at Neyveli. The length of Ropeway is 13 Km approximately.
  • Feasibility Study for a Material Ropeway for transportation of Pooja and Construction material for Sabrimala Temple in Kerala. The length of Ropeway is 3 Km approximately.
  • Feasibility Study for a Material Ropeway for transportation of Pooja and Construction material for Mata Vaishno Devi Temple at Katra, J&K, India. The length of Ropeway is 3 Km approximately.
 
Sitemap | FAQs | Employee Portal | Employees Corner | Inspection Portal | Important links | Complaints | Feedback | ESS-SAP | E-pledge-VAW | Photo Gallery | Twitter | Facebook